Major Gas Pipeline

SCOPE is the implementation of EnergySys for a 691km pipeline, from Azerbaijan to Georgia.

SCOPE is the implementation of EnergySys for a 691km pipeline, from Azerbaijan to Georgia.

The SCOPE management system supports the core activities of this joint-venture in controlling the technical operation of the pipeline. This means the provision of necessary and sufficient metered data to partners in an accurate and timely fashion; ensuring effective Hydrocarbon Accounting Volumes management; providing effective Nominations management; and supporting statutory and management reporting.


The EnergySys Cloud Platform is purely SaaS with no option for on-premise or hybrid models. We are hosted on AWS and every one of our users, including BTC, benefit from our use of a range of AWS services like CloudWatch, S3 and CloudFormation. AWS helps us manage all our users infrastructure and IT needs, reducing costs and increasing productivity. Together we provide unparalleled value and flexibility to our users. 

No hidden fees on blue background

EnergySys: The Movie

A showcase of the benefits the first 100% cloud-native platform for production allocation and reporting can deliver to you and your team.

Laptop and full cup of coffee

Production allocation software that works

We challenged ourselves to rethink oil and gas software from the ground up. To make it as simple, efficient and easy to use as possible. Welcome to the EnergySys Cloud Platform, the first 100% cloud-native platform for production data management and hydrocarbon accounting.

Download
iPad and iPhone showing EnergySys Platform

5 things you shouldn’t do when changing Production Accounting Systems

Is your current production accounting system no longer delivering what you need? Do you feel trapped, with no options and no choice? Find out what you need to do to get your team back on track.

Download